Work completed since last update:

•Grading and backfilling with subbase and base has been completed to Belknap Street.

•Concrete pavement has been placed in the left turn lanes between 12th and Winter Street and sidewalk has been placed in various locations at Winter Street.

•Concrete curb and gutter has been placed along the center medians.

•Concrete planters have been formed and poured at 12th, 13th, and 14th Street.

•Signal bases and pull boxes have been installed at Winter Street, and light pole bases have been installed between the railroad tracks and Broadway Street.

•Storm sewer inlets have been repaired or replaced on 3rd street. The first layer of Asphalt has been placed on Winter Street.

Anticipated work schedule for the week of September 2, 2013:

•Concrete sidewalk is scheduled to continue between Winter Street and 12th Street.

•Concrete mainline paving is scheduled to be completed from 12th Street to Belknap Street with curb and gutter to follow.

•The railroad is scheduled to replace the concrete crossing surface midweek.

•Topsoil restoration will continue between 4th Street and 8th Street. 

Next Weekly Public Meeting:  Wednesday, Sept. 4 at 2 p.m. at the Old Post Office Building, 1401 Tower Ave, Superior, WI, 54880